We hope you were able to join us on May 18, 2024 on our 200 mile ride through Yolo, Napa, and Lake counties, the most popular and one of the best supported double centuries in California. We will return in May 17, 2025 – check back with us when we have the details.
The route headed northwest from Davis along flat roads of Yolo County, then south and west through Winters, around the south side of Lake Berryessa via Highway 128, then northwest along back roads including a few miles on the west shore of Lake Berryessa, continuing northeast of the Napa Valley to Middletown, then past the east shore of Clear Lake, then east to the Capay Valley via Highways 20 and 16 before returning to Davis.
The route included just under 9,000 feet of climbing. Nearly all of the climbing is under 10%, primarily in the 6-8% range, ending well before mile 150. Note that there is a four-mile section of hard-pack dirt road with a gradual climb halfway through the course.
2024 Ride Info and Results
- Davis Double Century FAQs
- Detailed route description – Link to 2024 route on RideWithGPS
- Davis Double Century Results
Our sincere thanks to Cooper Thompson for our Davis Double Century 2024 logo design!